ARCHITECT
Triad Design GroupSIZE
3,000 SFDELIVERY
Design-BuildSamet partnered with Syska Hennessey to deliver a state-of-the-art data center for Wake Forest Baptist Health, High Point Medical Center, replacing their outdated facility in Mt. Pleasant, SC. The project included high-density, energy-efficient electrical and cooling systems with 2N power, N+1 cooling, hot aisle containment, overhead cable distribution, FM 200 fire protection, and a digital building monitoring system. Key installations included a 600kW emergency generator, automatic transfer switch, upgraded switchgear, redundant UPS systems, bus duct, overhead cable trays, and DX CRAC units.