OMNI INDUSTRIALÂ Â >Â Â DISTRIBUTION FACILITY
Joint Venturer Partner — Triad Design Group
SIZE —
117,568 SF
PROJECT DELIVERY —
Design/Build
VALUE @ COMPLETION / 2021 —
$6.2m
- Samet was chosen to complete this speculative building in Omni Industrial Park.
- This facility offers 50,000 – 117,568 square feet (expandable to 200,000 SF) of industrial space for lease. This building is currently under construction and will deliver in shell condition Q1 2018. This building is suitable for manufacturing, distribution or warehouse use and is conveniently located off I-26 with two access points, Jedburg interchange (Exit 194) and Nexton interchange (Exit 197).
- 21 dock doors, 1 drive-in
- Clear height: 26’ eave; 29’ center
- Column spacing: 50- x 54’
- Up to 150 parking spaces
- 13 dock doors
- 1 drive-in
- Insulated precast concrete
“quote”